Malaysia
Minister: Malaysia targets up to RM170b in carbon capture investments, six hubs by 2050
Tuesday, 24 Nov 2026 11:46 AM MYT
KUALA LUMPUR, Nov 24 — The Carbon Capture, Utilisation and Storage (CCUS) Roadmap 2050 outlines 27 initiatives with projected investments ranging from RM160 billion to RM170 billion, as well as the potential development of up to six CCUS hubs in Malaysia by 2050, said Economy Minister Akmal Nasrullah Mohd Nasir. He said the industry is projected to generate a cumulative gross value added of between US$200 billion and US$250 billion (US$1=RM4.12), with direct and indirect jobs of between 150,000 and 250,000 created at the peak of its operations. "The government has identified four key projects under the roadmap, including the development of a carbon storage site in Duyong, near Pahang."Petroliam Nasional Bhd (Petronas) will spearhead the initiative, with a target for the first commercial injection of carbon dioxide (CO2) by 2030,” he told a press conference following the launch of the CCUS Roadmap 2050 today. He said Malaysia’s experience in managing the oil and gas industry also provides expertise that can be leveraged to develop the CCUS industry, particularly in carbon storage. Regarding the development of CCUS on the East Coast, he said carbon capture will take place in Terengganu, while the terminal will be developed in Pahang."Both states stand to gain economic benefits from the development of this industry, which will also create job opportunities outside the Klang Valley,” he said.As for regional cooperation, Akmal Nasrullah said Malaysia is in discussions with Japan, South Korea, and Singapore concerning CCUS, with a memorandum of understanding on this collaboration expected to be signed next year.At the same time, he said the CCUS Act 2025 has been drafted to provide a framework for the export and import of CO2, while an intergovernmental understanding is needed to clarify procedures for cross-border CO2 transfers. Addressing concerns raised by non-governmental organisations about the costs and environmental impact of CCUS, he said the government must handle the matter transparently and consider the effects on local communities as part of Malaysia’s efforts to achieve net-zero carbon emissions by 2050. Meanwhile, Akmal said that one of the key projects illustrating the roadmap’s implementation path is the Southern CCS Hub, led by Petronas in collaboration with Mitsui and TotalEnergies. "This project entails a CO2 receiving terminal in Kuantan, a 245-kilometre offshore pipeline, and a storage capacity of five million tonnes per year at the Duyong field. "Three other major projects are the National Carbon Capture Project, as well as Project Dragon and Project Chlorobloom by Tenaga Nasional Bhd (TNB),” he said. He said these projects involve carbon capture in industrial settings and the use of CO2 to produce fuels and algae-based products. "As follow-up measures, the Ministry of Economy is commencing three studies — the development of the Malaysia CCUS Roadmap 2050 action plan, a study on emission clusters and CCUS business models, and a study on CCUS industrial clusters for the East Coast,” Akmal Nasrullah added. — Bernama
You May Also Like